Marine cum Storage cum Errection

What is Marine cum Storage cum Errection?

This is a comprehensive policy covering all physical risks which a project is exposed to right from the warehouse of the supplier of equipments – whether imported or indigenous – to its erection, testing and commissioning at the site.

Who can take the policy?

Marine cum Storage cum Errection

The policy can be taken by the principal, contractor or sub contractor, jointly or separately.

This is a comprehensive policy covering all physical risks which a project is exposed to.

Scope:

The policy comprises of 2 Sections :

    • Section I-Material Damage-covering physical loss, damage or destruction of the property insured by any cause, other than those specifically excluded in the policy.
    • Section II-Third Party Liability-covering the legal liability falling on the insured contractor as a result of bodily injury or property damage belonging to a third party.

Add on covers

Cover Addons
  • Clearance and removal of debris
  • Damage to owner’s surrounding property
  • Maintenance visit / extended maintenance cover
  • Additional customs duty
  • Civil works
  • Express freight
  • Air freight
  • Deletion of duration clause under marine

How to select the sum insured?

The sum insured selected under section I should not be less than the completely erected value of the property inclusive of estimated freights, customs duty, erection cost etc.

In case of long term contracts, there is bound to be escalation in prices i.e.prime cost. The basic policy will pay only as per the original cost and prices. However escalation clause can be opted for, under which escalation upto 50%, can be selected to take care of such increase in prices during the policy period.

The sum insured shall be adjustable on completion of the erection, on the basis of actual values incurred by the insured in respect of freights, handling charges, customs dues, cost of erection etc. and premium adjusted accordingly.

The sum insured under section II should represent the per accident limit (the maximum legal liability that may fall on the insured as a result of an accident in the insured’s site). The limit per policy period should be fixed taking into account the maximum number of such accidents which can reasonably be expected to occur.

Period of Insurance

The period of insurance should not be less than the period of contract and should commence from the date of unloading of the first consignment at the site of the erection and shall continue upto the conclusion of the first test operation or test loading subject to a maximum of 4weeks from the date trial running is made and / or readiness for work is declared by the erectors. If a part of the plant or one or several machines are tested and put into the operation, the coverage under the policy for that particular part of the plant or machine will cease, whereas the coverage will continue for the remaining parts which are not yet ready.

In case approval of the plant or any part thereof is not given by the concerned authorities even after expiry of 4weeks of trial running, the policy can be extended and the extra premium to be arranged beforehand.

How to claim?

In the event of any loss or damage giving rise to a claim under the policy, the following steps should be taken :-

  • Take necessary steps to minimise the loss.
  • Inform insurance company immediately.
  • Inform fire brigade in case of fire and police authorities in case of theft.
  • Extend full cooperation to the surveyor deputed by the company.
  • Submit duly filled in claim form along with necessary documents to substantiate the financial loss suffered as a result of the accident.